| THE FOLLOWING DELIVERY AND SPECIFICATION CRITERIA MAY VARY BY PROJECT
DELIVERY: ESTIMATED DELIVERY DATE, 8 -10 WEEKS AFTER RECEIPT OF ALL OF THE FOLLOWING ITEMS:
1. PURCHASE ORDER.
2. SIGNED CUSTOMER APPROVAL OF ALL DRAWING SHEETS. DRAWINGS ARE GENERALLY
MADE AVAILABLE TO THE CUSTOMER APPROXIMATELY 5-7 BUSINESS DAYS
FOLLOWING RECEIPT OF CUSTOMERS DRAWINGS AND DIMENSIONS.
3. WRITTEN CUSTOMER EXTERIOR COLOR SELECTION.
4. RECEIPT OF CUSTOMER’S ESTIMATED GENERATOR SET ARRIVAL DATE
(IF
APPLICABLE).
5. RECEIPT OF GENERATORS/SWITCHBOARDS/ATS AND OTHER APPLICABLE CUSTOMER DRAWINGS
AND DIMENSIONS.
ASI IS NOT RESPONSIBLE FOR DELAYS OR COST OVER-RUNS BASED ON
STATE PERMITTING AND LOAD REQUIRMENTS. THESE COSTS ARE ADDERS TO OUR ESTIMATED FREIGHT COST.
ACCOUSTICAL SHEETMETAL INCORPORATED DOES NOT GUARANTEE THE ARRIVAL OF SHIPMENT(S) AT A CERTAIN HOUR OR DATE, UNDER ANY CIRCUMSTANCES. ALL SCHEDULES PROVIDED BY ASI ARE BEST ESTIMATES AND CAN CHANGE DUE TO TRANSPORTATION AND OTHER FACTORS BEYOND THE CONTROL OF ASI.
THE PRICE OF A PROSPAL MAY BE SUBJECT TO CHANGE IF PURCHASE ORDER IS NOT RECEIVED WITHIN 10 DAYS. A STEEL AND ALUMINUM COST SURCHASE HAS BEEN ADDED TO THIS QUOTATION AND IS VALID FOR 30 DAYS. THIS SURCHARGE IS BASED ON INCREASED STEEL AND ALUMINUM PRICES AFFECTIMNG THE ENTIRE MANUFACTURING INDUSTRY. AFTER 30 DAYS ASI MUST ASSESS A COST ADDER BASED ON PREVAILING STEEL AND ALUMINUM PRICES.
IN ORDER FOR ASI’S GURANTEE TO BE VALID THE ENCLOSURE AND BASE TANK HAS TO BE BUILT PER THE DESIGN AND CONSTRUCTION OF ASI AND THE MUFFLER NOISE CANNOT EXCEED THE REQUESTED dB/A LEVEL AT FINIAL TESTING.
ASI TAKES EXCEPTION TO ALL OTHER REQUIREMENTS OF SPECIFICATIONS OTHER THAN THAT WHICH IS ON THE PROPOSAL AND ONLY IS BIDDING ON ITEMS LISTED<.
ASI TAKES EXCEPTION TO ALL CONSTRUCTION STYLE SPECIFICATIONS.
|